Description
AHT recently commissioned 10 m³/h and SRS 4 m³/h Hydraspin Oil Water Separator for a copper mine workshop.
Hydraspin ES 26m3/h; and SRS 3.6m3/h;
Description
The entire Transnet diesel locomotive workshop and refueling area discharges to the effluent treatment system provided by AHT.
Hydraspin ES 26m3/h;, SRS & Water Quality Probe.3.6m3/h;, TOC
Description
The water is discharged into storm water and total water quality and flowrate was measured by Instralink the AHT telemetry system.
6 Hydraspin, 5 SRS, Water Quality Probe & 2 Flowmeter
Description
Hydraspin ES 26 m3/h; & SRS 3.6 m3/h; for the Washbay
Description
Complete washbay and mining workshop effluent treatment system supplied. We removed 40 000 Litres in first 2 months.
Hydramix Process 20m3/h;
Description
The Hydramix process consists of Hydraspin is on complex waste water streams. We removed oil down to below 2ppm.
Hydraspin ES 4m3/h; and SRS 3.6m3/h; Zone1
Description
Treating all the run-off water from a bulk fuel storage terminal. Discharge to storm water below 2.5ppm oil and grease.
Hydraspin ES 4m3/h; Zone1
Description
Both installations are located in Zone1 classified areas and all control panels were situated in safe areas 100m away. Zone1 motor and switch gear were supplied.
Hydraspin ES 4m3/h;
Description
Treating all the run-off water from a bulk fuel storage terminal.
Hydraspin ES 4m3/h;
Description
Treating all the run-off water from a bulk fuel storage terminal.
Coconut & Palm Oil Factory Hydraspin ES 4m3/h;
Description
Treatment of effluent from factory to recover valuable oil for reprocessing. High temperature pump was supplied.
Hydraspin ES 4m3/h; and SRS 3.6m3/h;
Description
Treatment of workshop effluent .
3 x Model 24 A 110 Sewage Treatment Plants (38 to 55 m3 per day)
Description
AHT supplied conventional sewer treatmentsystem to the management village, truck stop and hospital sites each serving 200 to 300 people per day.
Containerized Underground Mine 1500 L/H RO System
Description
AHT supplied the drinking water system to provide miners with water. Installation was vertically 800m below surface. Containerized plant travelled 11km down incline to reach site.
ES 36 m3/h; & SRS 3.6 m3/h; for the Washbay & opencast workshop
Description
AHT assisted with concept design of effluent surrounding the opencast workshop.
ES 10m3/h; & SRS 3.6 m3/h; for the gas exploration workshop and maintenance yard.
Description
The telemetry system integrated with Hydraspin in this installation was satelite based and reported all data to our AHT client website portal.
Bio Remediation of Moreleta Spruit and Oil Spill Clean Up
Description
Menlyn Shopping Centre had a huge diesel spill during the commisioning of generator sets, which entered the storm water and contaminated the Moreleta Spruit. DissOil was used to rehabilitate the pollution. AHT managed the entire cleanup operation and dealt with relevant authorities.